
Time Savings Overview Report-Time Grouped
Report generates totals about time savings grouped by time intervals over a specified duration. The time savings information included in the report is limited to those created within the specified duration. If results are limited by "Assignee", "Statuses", or "Incident Categories", the time savings records are limited to Incidents which have not been deleted from the system.
Widget Type | Description |
---|---|
Stacked Bar Graph | Creates a stacked bar graph based on the selected report options. |
Bar Graph | Creates a bar graph based on the selected report options. |
Report Options
Option | Description |
---|---|
Statuses | Limits matching incidents to the set of selected statuses. |
Interval | Defines the date-time grouping interval, which is the unit of time for grouping results.
This is a required field.
|
Time/Cost Savings / Nodes | Limits time savings information to the selected flow nodes. Use the the Time Savings Information dialog to associate time savings and hourly rate information to a flow node.
This is a required field.
|
Incident Categories | Limits matching incidents to the set of selected categories. |
Duration | Defines the relative time span of the report. For example, some possible values are Last Week , Last Month , or Last X Hours . |
Span: Value of X | When required by the chosen Duration , the number represents the X value for the selected Last X * duration. |
Assignee | Restricts the report to the assignee. |
Reference | The end date/time of the report. |
Nevelex Labs, Main Office
Metro Office Park
2950 Metro Drive, Suite 104
Bloomington, MN 55425
Phone: +1 952-500-8921
©Nevelex Labs, LLC. 2018-2023, All Rights Reserved.
EULA